Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Ford Mustang Shelby GT500 Super Snake, for the times when 540 hp just isn’t enough

Fri, 26 Jun 2009

There was little doubt that Shelby would not call it a day following the completion of the 2010 Ford Shelby Mustang GT500. After all, 540 hp just might not cut it for some Shelby faithful. So to take the 2010 GT500 to the next level, Shelby revealed the Super Snake package at the Mid America Ford and Team Shelby Nationals in Tulsa, Okla.

Porsche Panamera diesel owners can boost the fun with TechArt power upgrade

Fri, 06 Jul 2012

The German Porsche tuning haus TechArt revealed a power-upgrade kit for the Porsche Panamera diesel. While the 30-hp bump from the stock 250 horses to 280 won't light the world on fire, the 37-lb-ft jump in torque, from 405 lb-ft to 442 lb-ft, is sure to be a kick in the pants. The 0-to-60-mph time drops by 0.1 second from stock to 6.6 seconds, but the top end is up 3 mph to 153 mph.

Ford Design Center set to expand

Wed, 13 Apr 2011

Symbolic of the importance it plays in Ford's small car strategy, the automakers Design Center in Cologne, Germany, is about to receive a €11.6m redevelopment. Construction is already underway on the facility's new wing, which will include design studios and 100 workplaces. The 3,000 square-meter extension is set to be completed by the end of the year.